If the errors of a message run are solved, and no re-run in History management is required, the message run status is not automatically set to Finished. Therefore, you can mark the message run as Solved. As a result, the message run status is set to Finished.
1. | Click Connectivity studio Integration operations. |
2. | On the History errors tab, in the list, find and select the desired message run. |
3. | Click History. |
4. | On the Action pane, on the History tab, click Solved. |
5. | Close the page. |